Train route

22964 BVC BDTS SFAST Route & Timetable

Bhavnagar Terminus (BVC) to Bandra Terminus (BDTS), with 18 listed stops.

OriginBhavnagar TerminusBVC
→
DestinationBandra TerminusBDTS
Stops listed18
ServiceSUPERFAST · Super Fast
RunsSun
Journey time13.40
Distance778 km
RailwayWR
Stop-by-stop route

BVC BDTS SFAST (22964) timetable

Arrival, departure, day and halt values are scheduled details; live conditions may differ.

#DayStationArrivalDepartureHaltPlatformDistance
1Day 1Bhavnagar TerminusBVCFirst17.450 min10 km
2Day 1Sihor GujaratSOJN18.0818.091 min121 km
3Day 1SongadhSGD18.1718.181 min128 km
4Day 1Dhola JnDLJ18.3518.361 min249 km
5Day 1Botad JnBTD19.1319.152 min292 km
6Day 1JoravarnagarJVN20.0620.071 min—164 km
7Day 1Viramgam JnVG21.4521.472 min2232 km
8Day 1Ahmedabad JnADI23.0523.1510 min4298 km
9Day 2Nadiad JnND00.0600.082 min1343 km
10Day 2Anand JnANND00.2300.252 min4362 km
11Day 2Vadodara JnBRC01.0601.115 min2397 km
12Day 2Bharuch JnBH02.0402.062 min4468 km
13Day 2SuratST03.1203.175 min2526 km
14Day 2NavsariNVS03.3303.352 min2556 km
15Day 2VapiVAPI04.2304.252 min2619 km
16Day 2Dahanu RoadDRD04.5805.002 min2669 km
17Day 2BorivaliBVI06.2806.302 min9759 km
18Day 2Bandra TerminusBDTS07.25Last0 min6778 km