Train route snapshot

37741 BDC-KWAE LOCAL Route & Timetable

Bandel Jn (BDC) to Katwa Jn (KWAE), with 29 listed stops.

OriginBandel JnBDC
→
DestinationKatwa JnKWAE
Stops listed29
ServiceSUBURBAN · EMU
RunsDaily
Journey time02.10
Distance105 km
RailwayER
Stop-by-stop route

BDC-KWAE LOCAL (37741) timetable

Arrival, departure, day and halt values are from the eRail crawl captured 3–4 November 2026 snapshot.

#DayStationArrivalDepartureHaltPlatformDistance
1Day 1Bandel JnBDCFirst03.050 min30 km
2Day 1Bansh BariaBSAE03.1203.131 min24 km
3Day 1TribeniTBAE03.1603.171 min38 km
4Day 1KuntighatKJU03.1903.201 min212 km
5Day 1DumurdahaDMLE03.2203.231 min—15 km
6Day 1KhamargachhiKMAE03.2503.261 min217 km
7Day 1JiratJIT03.3003.311 min122 km
8Day 1BalagarhBGAE03.3303.341 min125 km
9Day 1Somra BazarSOAE03.3603.371 min128 km
10Day 1BehulaBHLA03.4103.421 min—33 km
11Day 1GuptiparaGPAE03.4403.451 min235 km
12Day 1Ambika KalnaABKA03.5003.511 min242 km
13Day 1BaghnaparaBGRA03.5403.551 min246 km
14Day 1DhatrigramDTAE03.5904.001 min351 km
15Day 1Nandaigram HaltNDIM04.0304.041 min—54 km
16Day 1SamudragarhSMAE04.0704.081 min158 km
17Day 1KalinagarKLNT04.1104.121 min161 km
18Day 1Nabadwip DhamNDAE04.1604.171 min366 km
19Day 1Bisnupriya HVSPR04.1904.201 min—68 km
20Day 1BhandartikuriBFZ04.2304.241 min171 km
21Day 1PurbasthaliPSAE04.2604.271 min373 km
22Day 1Mertala Phaleya HMTFA04.3004.311 min—76 km
23Day 1LakshmipurLKX04.3404.351 min179 km
24Day 1BelerhatBQY04.3704.381 min—82 km
25Day 1PatuliPTAE04.4204.431 min387 km
26Day 1AgradwipAGAE04.4704.481 min192 km
27Day 1Sahebtala HSHBA04.5004.511 min—95 km
28Day 1DainhatDHAE04.5404.551 min398 km
29Day 1Katwa JnKWAE05.15Last0 min1A105 km