Train route snapshot

37742 KWAE-BDC LOCAL Route & Timetable

Katwa Jn (KWAE) to Bandel Jn (BDC), with 30 listed stops.

OriginKatwa JnKWAE
→
DestinationBandel JnBDC
Stops listed30
ServiceSUBURBAN · EMU
RunsDaily
Journey time02.14
Distance105 km
RailwayER
Stop-by-stop route

KWAE-BDC LOCAL (37742) timetable

Arrival, departure, day and halt values are from the eRail crawl captured 3–4 November 2026 snapshot.

#DayStationArrivalDepartureHaltPlatformDistance
1Day 1Katwa JnKWAEFirst04.160 min—0 km
2Day 1DainhatDHAE04.2404.251 min—7 km
3Day 1Sahebtala HSHBA04.2804.291 min—10 km
4Day 1AgradwipAGAE04.3104.321 min—13 km
5Day 1PatuliPTAE04.3604.371 min—18 km
6Day 1BelerhatBQY04.4104.421 min—23 km
7Day 1LakshmipurLKX04.4404.451 min—25 km
8Day 1Mertala Phaleya HMTFA04.4704.481 min—29 km
9Day 1PurbasthaliPSAE04.5104.521 min—32 km
10Day 1BhandartikuriBFZ04.5404.551 min—34 km
11Day 1Bisnupriya HVSPR04.5504.561 min—37 km
12Day 1Nabadwip DhamNDAE05.0005.022 min—39 km
13Day 1KalinagarKLNT05.0605.071 min—44 km
14Day 1SamudragarhSMAE05.1005.111 min—47 km
15Day 1Nandaigram HaltNDIM05.1305.141 min—50 km
16Day 1DhatrigramDTAE05.1705.181 min—54 km
17Day 1BaghnaparaBGRA05.2105.221 min—58 km
18Day 1Ambika KalnaABKA05.2605.271 min—62 km
19Day 1GuptiparaGPAE05.3205.331 min—70 km
20Day 1BehulaBHLA05.3505.361 min—72 km
21Day 1Somra BazarSOAE05.4005.411 min—77 km
22Day 1BalagarhBGAE05.4405.451 min—79 km
23Day 1JiratJIT05.4805.491 min—83 km
24Day 1KhamargachhiKMAE05.5405.551 min—88 km
25Day 1DumurdahaDMLE05.5605.571 min—90 km
26Day 1KuntighatKJU05.5906.001 min—93 km
27Day 1TribeniTBAE06.0306.041 min—96 km
28Day 1Islampara HaltIPRA06.0506.061 min—99 km
29Day 1Bansh BariaBSAE06.0806.091 min—100 km
30Day 1Bandel JnBDC06.30Last0 min—105 km