Train route snapshot

37743 BDC-KWAE LOCAL Route & Timetable

Bandel Jn (BDC) to Katwa Jn (KWAE), with 30 listed stops.

OriginBandel JnBDC
→
DestinationKatwa JnKWAE
Stops listed30
ServiceSUBURBAN · EMU
RunsDaily
Journey time02.15
Distance105 km
RailwayER
Stop-by-stop route

BDC-KWAE LOCAL (37743) timetable

Arrival, departure, day and halt values are from the eRail crawl captured 3–4 November 2026 snapshot.

#DayStationArrivalDepartureHaltPlatformDistance
1Day 1Bandel JnBDCFirst04.300 min—0 km
2Day 1Bansh BariaBSAE04.3704.381 min—4 km
3Day 1Islampara HaltIPRA04.4004.411 min—6 km
4Day 1TribeniTBAE04.4204.431 min—8 km
5Day 1KuntighatKJU04.4604.471 min—12 km
6Day 1DumurdahaDMLE04.4904.501 min—15 km
7Day 1KhamargachhiKMAE04.5204.531 min—17 km
8Day 1JiratJIT04.5704.581 min—22 km
9Day 1BalagarhBGAE05.0005.011 min—25 km
10Day 1Somra BazarSOAE05.0305.041 min—28 km
11Day 1BehulaBHLA05.0805.091 min—33 km
12Day 1GuptiparaGPAE05.1105.121 min—35 km
13Day 1Ambika KalnaABKA05.1705.181 min—42 km
14Day 1BaghnaparaBGRA05.2105.221 min—46 km
15Day 1DhatrigramDTAE05.2605.271 min—51 km
16Day 1Nandaigram HaltNDIM05.3005.311 min—54 km
17Day 1SamudragarhSMAE05.3405.351 min—58 km
18Day 1KalinagarKLNT05.3805.391 min—61 km
19Day 1Nabadwip DhamNDAE05.4305.441 min—66 km
20Day 1Bisnupriya HVSPR05.4605.471 min—68 km
21Day 1BhandartikuriBFZ05.5005.511 min—71 km
22Day 1PurbasthaliPSAE05.5305.541 min—73 km
23Day 1Mertala Phaleya HMTFA05.5705.581 min—76 km
24Day 1LakshmipurLKX06.0106.021 min—79 km
25Day 1BelerhatBQY06.0406.051 min—82 km
26Day 1PatuliPTAE06.0906.101 min—87 km
27Day 1AgradwipAGAE06.1406.151 min—92 km
28Day 1Sahebtala HSHBA06.1706.181 min—95 km
29Day 1DainhatDHAE06.2106.221 min—98 km
30Day 1Katwa JnKWAE06.45Last0 min—105 km