Train route snapshot

37750 KWAE-BDC LOCAL Route & Timetable

Katwa Jn (KWAE) to Bandel Jn (BDC), with 30 listed stops.

OriginKatwa JnKWAE
→
DestinationBandel JnBDC
Stops listed30
ServiceSUBURBAN · EMU
RunsDaily
Journey time02.10
Distance105 km
RailwayER
Stop-by-stop route

KWAE-BDC LOCAL (37750) timetable

Arrival, departure, day and halt values are from the eRail crawl captured 3–4 November 2026 snapshot.

#DayStationArrivalDepartureHaltPlatformDistance
1Day 1Katwa JnKWAEFirst17.350 min—0 km
2Day 1DainhatDHAE17.4317.441 min—7 km
3Day 1Sahebtala HSHBA17.4717.481 min—10 km
4Day 1AgradwipAGAE17.5017.511 min—13 km
5Day 1PatuliPTAE17.5517.561 min—18 km
6Day 1BelerhatBQY18.0018.011 min—23 km
7Day 1LakshmipurLKX18.0318.041 min—25 km
8Day 1Mertala Phaleya HMTFA18.0618.071 min—29 km
9Day 1PurbasthaliPSAE18.1018.111 min—32 km
10Day 1BhandartikuriBFZ18.1318.141 min—34 km
11Day 1Bisnupriya HVSPR18.1618.171 min—37 km
12Day 1Nabadwip DhamNDAE18.1918.212 min—39 km
13Day 1KalinagarKLNT18.2518.261 min—44 km
14Day 1SamudragarhSMAE18.2918.301 min—47 km
15Day 1Nandaigram HaltNDIM18.3218.331 min—50 km
16Day 1DhatrigramDTAE18.3618.371 min—54 km
17Day 1BaghnaparaBGRA18.4018.411 min—58 km
18Day 1Ambika KalnaABKA18.4518.461 min—62 km
19Day 1GuptiparaGPAE18.5118.521 min—70 km
20Day 1BehulaBHLA18.5418.551 min—72 km
21Day 1Somra BazarSOAE18.5919.001 min—77 km
22Day 1BalagarhBGAE19.0219.031 min—79 km
23Day 1JiratJIT19.0619.071 min—83 km
24Day 1KhamargachhiKMAE19.1219.131 min—88 km
25Day 1DumurdahaDMLE19.1419.151 min—90 km
26Day 1KuntighatKJU19.1719.181 min—93 km
27Day 1TribeniTBAE19.2119.221 min—96 km
28Day 1Islampara HaltIPRA19.2319.241 min—99 km
29Day 1Bansh BariaBSAE19.2519.261 min—100 km
30Day 1Bandel JnBDC19.45Last0 min—105 km