Train route snapshot

37755 BDC - KWAE LOCAL Route & Timetable

Bandel Jn (BDC) to Katwa Jn (KWAE), with 29 listed stops.

OriginBandel JnBDC
→
DestinationKatwa JnKWAE
Stops listed29
ServiceSUBURBAN · EMU
RunsDaily
Journey time02.15
Distance105 km
RailwayER
Stop-by-stop route

BDC - KWAE LOCAL (37755) timetable

Arrival, departure, day and halt values are from the eRail crawl captured 3–4 November 2026 snapshot.

#DayStationArrivalDepartureHaltPlatformDistance
1Day 1Bandel JnBDCFirst19.400 min50 km
2Day 1Bansh BariaBSAE19.4719.481 min24 km
3Day 1TribeniTBAE19.5119.521 min38 km
4Day 1KuntighatKJU19.5419.551 min212 km
5Day 1DumurdahaDMLE19.5819.591 min—15 km
6Day 1KhamargachhiKMAE20.0120.021 min317 km
7Day 1JiratJIT20.0520.061 min122 km
8Day 1BalagarhBGAE20.0820.091 min225 km
9Day 1Somra BazarSOAE20.1120.121 min128 km
10Day 1BehulaBHLA20.1620.171 min—33 km
11Day 1GuptiparaGPAE20.1920.201 min235 km
12Day 1Ambika KalnaABKA20.2520.261 min242 km
13Day 1BaghnaparaBGRA20.2920.301 min246 km
14Day 1DhatrigramDTAE20.3420.351 min351 km
15Day 1Nandaigram HaltNDIM20.3820.391 min—54 km
16Day 1SamudragarhSMAE20.4220.431 min158 km
17Day 1KalinagarKLNT20.4620.471 min161 km
18Day 1Nabadwip DhamNDAE20.5120.532 min366 km
19Day 1Bisnupriya HVSPR20.5520.561 min—68 km
20Day 1BhandartikuriBFZ20.5921.001 min171 km
21Day 1PurbasthaliPSAE21.0221.031 min373 km
22Day 1Mertala Phaleya HMTFA21.0621.071 min—76 km
23Day 1LakshmipurLKX21.1021.111 min179 km
24Day 1BelerhatBQY21.1321.141 min—82 km
25Day 1PatuliPTAE21.1821.191 min387 km
26Day 1AgradwipAGAE21.2321.241 min192 km
27Day 1Sahebtala HSHBA21.2621.271 min—95 km
28Day 1DainhatDHAE21.3021.311 min398 km
29Day 1Katwa JnKWAE21.55Last0 min2105 km