Train route snapshot

37757 BDC KWAE LOCAL Route & Timetable

Bandel Jn (BDC) to Katwa Jn (KWAE), with 30 listed stops.

OriginBandel JnBDC
→
DestinationKatwa JnKWAE
Stops listed30
ServiceSUBURBAN · EMU
RunsDaily
Journey time02.06
Distance105 km
RailwayER
Stop-by-stop route

BDC KWAE LOCAL (37757) timetable

Arrival, departure, day and halt values are from the eRail crawl captured 3–4 November 2026 snapshot.

#DayStationArrivalDepartureHaltPlatformDistance
1Day 1Bandel JnBDCFirst23.250 min—0 km
2Day 1Bansh BariaBSAE23.3223.331 min—4 km
3Day 1Islampara HaltIPRA23.3523.361 min—6 km
4Day 1TribeniTBAE23.3723.381 min—8 km
5Day 1KuntighatKJU23.4023.411 min—12 km
6Day 1DumurdahaDMLE23.4423.451 min—15 km
7Day 1KhamargachhiKMAE23.4723.481 min—17 km
8Day 1JiratJIT23.5123.521 min—22 km
9Day 1BalagarhBGAE23.5423.551 min—25 km
10Day 1Somra BazarSOAE23.5723.581 min—28 km
11Day 2BehulaBHLA00.0200.031 min—33 km
12Day 2GuptiparaGPAE00.0500.061 min—35 km
13Day 2Ambika KalnaABKA00.1100.121 min—42 km
14Day 2BaghnaparaBGRA00.1500.161 min—46 km
15Day 2DhatrigramDTAE00.2000.211 min—51 km
16Day 2Nandaigram HaltNDIM00.2400.251 min—54 km
17Day 2SamudragarhSMAE00.2800.291 min—58 km
18Day 2KalinagarKLNT00.3200.331 min—61 km
19Day 2Nabadwip DhamNDAE00.3700.381 min—66 km
20Day 2Bisnupriya HVSPR00.4000.411 min—68 km
21Day 2BhandartikuriBFZ00.4400.451 min—71 km
22Day 2PurbasthaliPSAE00.4700.481 min—73 km
23Day 2Mertala Phaleya HMTFA00.5100.521 min—76 km
24Day 2LakshmipurLKX00.5500.561 min—79 km
25Day 2BelerhatBQY00.5800.591 min—82 km
26Day 2PatuliPTAE01.0201.031 min—87 km
27Day 2AgradwipAGAE01.0601.071 min—92 km
28Day 2Sahebtala HSHBA01.0901.101 min—95 km
29Day 2DainhatDHAE01.1301.141 min—98 km
30Day 2Katwa JnKWAE01.31Last0 min—105 km