Train route snapshot

37923 HWH - KATWA LOCAL Route & Timetable

Howrah Jn (HWH) to Katwa Jn (KWAE), with 34 listed stops.

OriginHowrah JnHWH
→
DestinationKatwa JnKWAE
Stops listed34
ServiceSUBURBAN · EMU
RunsDaily
Journey time03.10
Distance144 km
RailwayER
Stop-by-stop route

HWH - KATWA LOCAL (37923) timetable

Arrival, departure, day and halt values are from the eRail crawl captured 3–4 November 2026 snapshot.

#DayStationArrivalDepartureHaltPlatformDistance
1Day 1Howrah JnHWHFirst18.000 min—0 km
2Day 1LiluahLLH18.0918.101 min—5 km
3Day 1ShrirampurSRP18.2218.231 min—20 km
4Day 1Chandan NagarCGR18.3218.331 min—32 km
5Day 1ChuchuraCNS18.3618.371 min—35 km
6Day 1Bandel JnBDC18.5118.532 min—39 km
7Day 1Bansh BariaBSAE19.0019.011 min—44 km
8Day 1Islampara HaltIPRA19.0319.041 min—45 km
9Day 1TribeniTBAE19.0519.061 min—47 km
10Day 1KuntighatKJU19.0819.091 min—51 km
11Day 1DumurdahaDMLE19.1219.131 min—54 km
12Day 1KhamargachhiKMAE19.1519.161 min—56 km
13Day 1JiratJIT19.1919.201 min—61 km
14Day 1BalagarhBGAE19.2219.231 min—64 km
15Day 1Somra BazarSOAE19.2519.261 min—67 km
16Day 1BehulaBHLA19.3019.311 min—72 km
17Day 1GuptiparaGPAE19.3319.341 min—74 km
18Day 1Ambika KalnaABKA19.3919.401 min—81 km
19Day 1BaghnaparaBGRA19.4319.441 min—85 km
20Day 1DhatrigramDTAE19.4819.491 min—90 km
21Day 1Nandaigram HaltNDIM19.5219.531 min—94 km
22Day 1SamudragarhSMAE19.5619.571 min—97 km
23Day 1KalinagarKLNT20.0020.011 min—100 km
24Day 1Nabadwip DhamNDAE20.0520.072 min—105 km
25Day 1Bisnupriya HVSPR20.0920.101 min—107 km
26Day 1BhandartikuriBFZ20.1320.141 min—110 km
27Day 1PurbasthaliPSAE20.1620.171 min—112 km
28Day 1Mertala Phaleya HMTFA20.2020.211 min—115 km
29Day 1LakshmipurLKX20.2420.251 min—118 km
30Day 1BelerhatBQY20.2720.281 min—121 km
31Day 1PatuliPTAE20.3220.331 min—126 km
32Day 1AgradwipAGAE20.3720.381 min—131 km
33Day 1DainhatDHAE20.4320.441 min—137 km
34Day 1Katwa JnKWAE21.10Last0 min—144 km