Train route snapshot

37924 KWAE-HWH LOCAL Route & Timetable

Katwa Jn (KWAE) to Howrah Jn (HWH), with 31 listed stops.

OriginKatwa JnKWAE
→
DestinationHowrah JnHWH
Stops listed31
ServiceSUBURBAN · EMU
RunsDaily
Journey time03.15
Distance144 km
RailwayER
Stop-by-stop route

KWAE-HWH LOCAL (37924) timetable

Arrival, departure, day and halt values are from the eRail crawl captured 3–4 November 2026 snapshot.

#DayStationArrivalDepartureHaltPlatformDistance
1Day 1Katwa JnKWAEFirst14.450 min—0 km
2Day 1DainhatDHAE14.5314.541 min—7 km
3Day 1Sahebtala HSHBA14.5714.581 min—10 km
4Day 1AgradwipAGAE15.0015.011 min—13 km
5Day 1PatuliPTAE15.0515.061 min—18 km
6Day 1BelerhatBQY15.1015.111 min—23 km
7Day 1LakshmipurLKX15.1315.141 min—25 km
8Day 1Mertala Phaleya HMTFA15.1615.171 min—29 km
9Day 1PurbasthaliPSAE15.2015.211 min—32 km
10Day 1BhandartikuriBFZ15.2315.241 min—34 km
11Day 1Bisnupriya HVSPR15.2615.271 min—37 km
12Day 1Nabadwip DhamNDAE15.2915.312 min—39 km
13Day 1KalinagarKLNT15.3515.361 min—44 km
14Day 1SamudragarhSMAE15.3915.401 min—47 km
15Day 1DhatrigramDTAE15.4515.461 min—54 km
16Day 1BaghnaparaBGRA15.5015.511 min—58 km
17Day 1Ambika KalnaABKA15.5415.551 min—62 km
18Day 1GuptiparaGPAE16.0016.011 min—70 km
19Day 1BehulaBHLA16.0316.041 min—72 km
20Day 1Somra BazarSOAE16.0816.091 min—77 km
21Day 1BalagarhBGAE16.1116.121 min—79 km
22Day 1JiratJIT16.1616.171 min—83 km
23Day 1KhamargachhiKMAE16.2116.221 min—88 km
24Day 1DumurdahaDMLE16.2416.251 min—90 km
25Day 1KuntighatKJU16.2716.281 min—93 km
26Day 1TribeniTBAE16.3016.311 min—96 km
27Day 1Islampara HaltIPRA16.3316.341 min—99 km
28Day 1Bansh BariaBSAE16.3516.361 min—100 km
29Day 1Bandel JnBDC17.0217.042 min—105 km
30Day 1Seoraphuli JnSHE17.2117.221 min—122 km
31Day 1Howrah JnHWH18.00Last0 min—144 km