Train route snapshot

37927 HWH - KATWA LOCAL Route & Timetable

Howrah Jn (HWH) to Katwa Jn (KWAE), with 42 listed stops.

OriginHowrah JnHWH
→
DestinationKatwa JnKWAE
Stops listed42
ServiceSUBURBAN · EMU
RunsDaily
Journey time03.29
Distance144 km
RailwayER
Stop-by-stop route

HWH - KATWA LOCAL (37927) timetable

Arrival, departure, day and halt values are from the eRail crawl captured 3–4 November 2026 snapshot.

#DayStationArrivalDepartureHaltPlatformDistance
1Day 1Howrah JnHWHFirst20.300 min—0 km
2Day 1LiluahLLH20.3820.391 min—5 km
3Day 1BelurBEQ20.4120.421 min—7 km
4Day 1BallyBLY20.4420.451 min—9 km
5Day 1UttarparaUPA20.4720.481 min—10 km
6Day 1Hind MotorHMZ20.4920.501 min—12 km
7Day 1KonnagarKOG20.5220.531 min—14 km
8Day 1RishraRIS20.5520.561 min—16 km
9Day 1ShrirampurSRP21.0221.031 min—20 km
10Day 1Seoraphuli JnSHE21.0621.071 min—22 km
11Day 1BaidyabatiBBAE21.0821.091 min—24 km
12Day 1BhadreshwarBHR21.1221.131 min—28 km
13Day 1MankunduMUU21.1421.151 min—30 km
14Day 1Chandan NagarCGR21.1721.181 min—32 km
15Day 1ChuchuraCNS21.2021.211 min—35 km
16Day 1HooghlyHGY21.2321.241 min—37 km
17Day 1Bandel JnBDC21.3521.372 min—39 km
18Day 1Bansh BariaBSAE21.4421.451 min—44 km
19Day 1Islampara HaltIPRA21.4721.481 min—45 km
20Day 1TribeniTBAE21.4921.501 min—47 km
21Day 1KuntighatKJU21.5221.531 min—51 km
22Day 1DumurdahaDMLE21.5621.571 min—54 km
23Day 1KhamargachhiKMAE21.5922.001 min—56 km
24Day 1JiratJIT22.0322.041 min—61 km
25Day 1BalagarhBGAE22.0622.071 min—64 km
26Day 1Somra BazarSOAE22.1022.111 min—67 km
27Day 1BehulaBHLA22.1422.151 min—72 km
28Day 1GuptiparaGPAE22.1722.181 min—74 km
29Day 1Ambika KalnaABKA22.2322.241 min—81 km
30Day 1BaghnaparaBGRA22.2722.281 min—85 km
31Day 1DhatrigramDTAE22.3222.331 min—90 km
32Day 1SamudragarhSMAE22.3922.401 min—97 km
33Day 1KalinagarKLNT22.4322.441 min—100 km
34Day 1Nabadwip DhamNDAE23.0223.042 min—105 km
35Day 1BhandartikuriBFZ23.0923.101 min—110 km
36Day 1PurbasthaliPSAE23.1223.131 min—112 km
37Day 1LakshmipurLKX23.1923.201 min—118 km
38Day 1BelerhatBQY23.2223.231 min—121 km
39Day 1PatuliPTAE23.2823.291 min—126 km
40Day 1AgradwipAGAE23.3223.331 min—131 km
41Day 1DainhatDHAE23.3823.391 min—137 km
42Day 1Katwa JnKWAE23.59Last0 min—144 km